Case Studies > Construction > Boynton Beach City Hall
Boynton Beach City Hall
Produced: 05/29/2008

Carpenter Electric was asked to rework the paralleling generators, for Boynton Beach City Hall, to include more load while providing a rework of the existing systems with less sensitivity to a portable generator connection.  This required tremendous scheduling with the City managers, FPL, Square D and code enforcement to provide a seamless rework while maintaining 911 and other sensitive systems.  Additionally Carpenter Electric was then contracted to provide connections for portable generators at four other buildings for the City of Boynton.